Taishan Construction gold mountain mark
TAISHANCONSTRUCTION
Prepared forHomeowner
Project969 Winterton Way Front Yard Transformation
ProposalTS-2026-WINT-969
Scope for pricing969 Winterton Way, Toronto, Ontario
Drawing: 3D Visualization Package
Front elevation render — 969 Winterton Way

Prepared for Homeowner by Taishan Construction

969 Winterton Way Front Yard Transformation

A complete front yard transformation,
designed before construction begins.

969 Winterton Way, Toronto, OntarioPrepared today

Private proposal

Prepared exclusively for this project.

Prepared exclusively for 969 Winterton Way. Scope is priced by the total interlocking area and the entrance steps, with a single project total for the selected work.

Taishan Construction gold mountain mark
TAISHANDesign-First Exterior Transformation
Proposal statusDesign Review
Prepared forHomeowner
Prepared byTaishan Construction
Site address969 Winterton Way, Toronto, Ontario
Reference3D Visualization Package
Interlocking area240 sq. ft. estimated
Front yardDriveway, walkway, landing & steps
Renders included6 visualizations
Estimated duration6 – 8 days
Last checkedChecking secure access…
Proposal IDTS-2026-WINT-969
Project total$5,820.00
VersionV1 — Design Review

3D visualization

See it before you build it.

Driveway field, border banding, walkway approach and boulevard apron — visualized before construction begins.

Project approach

How Taishan Construction delivers this scope.

A disciplined sequence from mobilization to turnover, coordinated with the homeowner.

01

See it before you build it

Your concrete driveway, curved walkway, porch landing and steps visualized in 3D before construction begins at 969 Winterton Way.

02

Built properly beneath the surface

Proper excavation, subgrade inspection, geotextile, compacted base and controlled grading beneath every hardscape area.

03

Clear scope, clean execution

Each service is presented as a complete lump sum, so the homeowner knows exactly what is included before we mobilize.

04

Inspected and turned over

Paver stability, grading, sod and finished edges inspected, deficiencies corrected and a final walkthrough completed with the homeowner.

What is included

Your investment scope.

Interlocking and entrance steps — priced as a single clear total.

Total interlocking area inclusive of 2ft border on both sides of driveway and walkway to home

240 sq. ft.at$18.00/sq. ft.
  • Excavation
  • Base preparation
  • Compaction
  • Paver installation
  • Edge restraints
  • Final cleanup
Project total$5,820.00CAD · All measurements are an estimation and will require field verification.

Construction sequence

A 2 – 3 day construction schedule.

Under normal site, weather, access, and material-delivery conditions.

DAY01

Mobilization, Demolition and Excavation

Site setup, protection, removal of the existing driveway surface, disposal of debris and excavation to subgrade.

DAY02

Base Preparation and Installation

Geotextile, aggregate base placement in controlled lifts, compaction, elevation verification and the concrete driveway field with paver borders and walkway.

DAY03

Steps, Landing and Turnover

Natural stone treads and risers, paver landing, final grading, sod installation, cleanup and walkthrough.

Review and confirmation

Scope review
969 Winterton Way

Please review the scope and investment summary above and confirm the materials, site conditions and measurements. Your project total reflects the work currently priced.

Note: All measurements are an estimation and will require field verification before construction begins.

Questions? Contact Jeff directly.
Interlocking areaTotal area inclusive of 2ft border on both sides of driveway and walkway to home
Steps3 new steps
RestorationGrading, sodding and final cleanup
Estimated durationApprox. 2 – 3 working days
MeasurementsEstimation — will require field verification
Reference3D Visualization Package
Project total$5,820.00
Estimated startTo be confirmed